Saturday, 19 April 2014

Status of progress following work on Easter Saturday

Easter Saturday, 19 April 2014

McDonald Jones' workers were busy working on site today, Easter Saturday, 19 April 2014.  They've been busily digging the trenches and preparing the site for the laying of the concrete foundations and slab.  The slab will be laid after the plumbers have been on site to lay the new sewerage and other pipes.

We drove-by late this afternoon after work had finished for the day and took the following photos.  It's exciting to finally see the dimensions and layout of the new home's foundations taking shape on our old block of land in real life.  It's so much better than trying to visualise how it looks from the drawing plans on paper.


    (Click on photos to enlarge view)


   

Dimensions for our ‘Douglas 10M’ with Chase façade

Overall home and land dimensions


Dimensions quoted in metres (m).

Home width:
  8.45m
Home length:
21.21m
Width of block of land:
12m
Depth of block of land:
49.5m
Size of block of land in square metres:
594m²

No comments:

Post a Comment