Wednesday
23 April 2014
More work
was done on site today. Heavy black plastic sheeting was laid over the
entire excavated area for the new home. Those polystyrene foam blocks
that were delivered yesterday have been laid over the top of that plastic
sheeting and along the perimeter of the foundations. It makes the height
of the new home's foundations look much higher than we had anticipated.
It looks like the workers have also started to lay the steel reinforcement
cables over the top of the polystyrene foam blocks. There's still a bit
more work needed to finish that off in readiness for the laying of the concrete
slab (which, all being well, is scheduled for next Monday, 28 April 2014).
Sydney's
weather is lovely in Autumn. We've been blessed with lovely Autumn
weather again all this week, cool/cold nights and early mornings followed by
clear blue skies and warm, lazy, sunny days averaging at about 27⁰C each
day. Perfect weather for all this work that McDonald Jones Homes has been
doing for us. We're so excited that things really seem to be moving along
after almost a year of planning.
Here's a couple of photos that I took through the security fencing on the way home from work this afternoon, which show the status of progress following today's work.
(Click on photos to view enlarged images)
Overall
home and land dimensions
Dimensions quoted in metres (m).
Home width:
|
8.45m
|
Home length:
|
21.21m
|
Width of block of land:
|
12m
|
Depth of block of land:
|
49.5m
|
Size of block of land in square metres:
|
594m²
|
No comments:
Post a Comment