Scaffolding was erected to the front of the construction site on Saturday 5 July so that the bricks could be safely laid at height at the front of the house.

Here’s some photos that I took this afternoon that show the status of the bricklaying work as at Monday afternoon, Monday 7 July 2014, after work had finished for the day.

The unique features of our Douglas 10M with Chase façade are really taking form now (albeit, with some slight modifications due to the gentle slope of our block of land and the raised concrete slab).