Thursday
27 March 2014
We’ve
had a week of widespread heavy rain and storms which have thankfully extended
far into the drought-stricken regions along the eastern states. It’s a good thing all the demolition work was
completed last week.
The
All Weather Access gravel/crushed rock was delivered and installed on Monday 24
March 2014. Sydney West Excavations did
a fantastic job for us. On the same day,
Digger Dunlop, erected and installed the silt barrier fencing. We really appreciate their help with
installing those anti-erosion measures for us, particularly at such short
notice. Luckily, the inclement weather
and heavy rain has not adversely affected the demolition site this week, and
there’s been no evidence of any sedimentary run-off to pollute our environment.
The
long term weather forecast for Sydney and Australia-wide appears to be
favourable for our forthcoming construction work, which should be in full swing
throughout the remainder of our Autumn and the coming Winter and Spring. A dry Winter is forecast along with the
return of the El Nino causing a long, hot, dry Spring and Summer ahead. This current rain might be the last heavy
falls that we’ll be blessed with until the end of that El Nino. Thank God we decided to upgrade all the wall
and ceiling insulations to the maximum possible sizes/ratings and for the
decision to install the local Aussie-made big Actron reverse-cycled, zoned and ducted air conditioning system in
the new home.
We
received the Clearance Certificate and copies of the relevant weighbridge
receipts today from our demolition company.
Copies have been duly sent to McDonald Jones Homes and Holroyd Council. We anticipate McDonald Jones Homes will be
notifying us shortly about when we’ll be placed on their Construction List –
hope it’s soon, it feels like it’s taking forever
to get to Construction (it’s now 10 months since we first started this project
with real earnest).
We
arranged a booking today with Council for their inspector to conduct their
required Post Demolition Inspection. The
first available time for that inspection will be on Monday morning 31 March
2014. Fingers crossed that all will go
well with that inspection and that nothing else will delay things any further.